Changelog
Publication updates
A dated record of additions and changes to this publication. These entries describe editorial work, not live infrastructure events.
Defined the Rue editorial scope
Organized service delivery, automation, restoration and operational review into a standalone publication.
Added the release switch method
Documented artifact identity, readiness, a local traffic switch and the limits of rollback.
Added scheduled job notes
Separated timer activation from idempotent application work and durable progress.
Wrote the restore drill
Outlined an isolated recovery check with explicit evidence and cleanup.
Added stop conditions to runbooks
Documented a branch-based procedure with observable entry and exit conditions.
Recorded configuration review questions
Grouped settings, credentials, changes and runtime checks into one review method.
Added an alert design note
Linked each proposed alert to an action and a verification procedure.
Mapped the four workbooks
Connected the local project studies to their original Rue articles.